Alpine Paving is getting set to begin work on Highway 99 north of Whistler Village on May 31 in conjunction with the province.
The work will cover about six kilometres from the north entrance to Emerald to the River of Golden Dreams bridge, 7 a.m. to 6 p.m., Monday to Saturday.
There will be single-lane alternating traffic for most of the project with minimal delays and stoppages expected, but residents are asked to plan their trips accordingly and shut off their engines if they do encounter lineups or controlled stoppages.
Construction speed limits will be in effect, and message boards in place to reflect up-to-date info for motorists.
The project is expected to wrap up by Sept. 4.